Field | Description |
---|---|
Code* |
Enter the code of the new review model. |
Name* |
Enter the name of the new review model. |
Document Status |
Enter the initial status for affected documents, such as DRAFT or INWORKS. |
Phase |
Enter the initial phase for affected documents, such as COLLABORATION NEEDED. |
Field | Description |
---|---|
Review Type Name* |
Zoom to select the review type to be attached to the review model. |
Review Option |
Click the drop down arrow and specify the review option:
|
Interval |
Enter the interval for when a periodic review will be scheduled. |
Advance Notice |
Enter an interval for when the system notifies the document owner that a periodic review needs to be started. |
Phase |
Click the drop down arrow and select the phase to be set in the document when the review is routed. |
Field | Description |
---|---|
Review Name* |
Displays the name of the review type attached to the review model. |
Review Purpose |
Enter the purpose of the review. This is the statement that will be inserted for each approver signing off on the review. |
Review Group |
If more than one approver must approve the document, zoom to select the review group to attach to the review type. |
Phase |
Click the drop down arrow and select the phase to be set in the document when the review is routed. |
Checklist |
Zoom to select the checklist to be attached to the review type. |
Auto Close |
Check this checkbox to automatically close the review once the last approval rule is met (reviewer approves). If this box is not checked, the document owner is notified once the last approval is complete. The document owner must manually close the review in the document to change the status or reschedule the next periodic review. |
Applicable Status |
Click the drop down arrow and select the status that will activate the review in the document, such as INWORKS. |
To Status |
Click the drop down arrow and select the status the document will change to once the review is closed, such as PRERELEASED. |
Phase on Start |
Click the drop down arrow and select the phase the document will change to once the review is routed, such as UNDER RELEASE REVIEW. |
Phase on Close |
Click the drop down arrow and select the phase the document will change to once the review is closed, such as EFFECTIVENESS REVIEW SCHEDULED. |
Review Option |
Click the drop down arrow and specify the review option:
|
Interval |
Enter the interval for when a periodic review will be scheduled. |
Advance Notice |
Enter an interval for when the system notifies the document owner that a periodic review needs to be started. |
NOTE: Steps 8-12 must be repeated for all review types to be added to the review model.